Scroll Top
109 Coolgardie Avenue, Redcliffe, WA, 6104

Field Goals

Wellhead

CASE STUDY 1

SUBSEA WELLHEAD RECOVERY ON NORTH WEST SHELF
Cliff Head

CASE STUDY 2

REDUCTION IN MAE's & OPEX ON OFFSHORE PLATFORM
VOGA HWU

CASE STUDY 3

ENGINEERED LIFT TO FACILITATE ACCESS TO OUTLYING WELL
Cliff Head Platform

CASE STUDY 4

SUCCESSFUL CLIFF HEAD SLICKLINE OPERATION
MPLT Picture

CASE STUDY 5

SLICKLINE CONVEYED MPLT IN PERTH BASIN SAVES OPERATOR TIME
Swab Picture

CASE STUDY 6

SWABBING ON 5 ½” UN-PERFORATED CASING
Inverted Dropped Object

CASE STUDY 7

INVERTED RIG UP & DROPPED OBJECT RECOVERY
Dougal McVicar
Triangle Energy (Operations)
Well Engineering Manager

CCI provided a Step Change in the Safety Management and Culture for offshore interventions on the Cliff Head Alpha facility. Intervention time reduced, costs became more predictable and HSE participation increased significantly

Neil Jackson
Jadestone Australia
Well Services Team Lead

Clear Cut Interventions have set a new precedent for safety during workovers on the Stag platform through exemplary HSE participation whilst offshore.

HWOU crews repeatedly demonstrate a continuous improvement mentality during operations that is led from the management team’

CONTACT US

We’d love to hear from you. Send a message using the form below we’ll get back to you as soon as we can.